Datong issued implementing rules of the photovoltaic power generation using

Arctic star solar PV network news: recently, Datong Government issued PV power using woodland reform pilot implementation rules, (following referred to rules), rules in the proposed PV power station construction of Qian reset conditions for: Lin Guang complementary PV power project array column using woodland, years rainfall 400mm following of regional cover degrees below 30% of shrubs woodland and years rainfall 400mm above regional cover degrees below 50% of shrubs woodland, and should be woodland and no State wood woodland, other to class ban using ; PV array bracket must use steel column or cylindrical cement block to ensure forest properties does not change; PV array supports the minimum height of not less than 1.5 m; PV array spacing at 6 meters.

Reads as follows:

The County (district) people’s Governments, all relevant units directly under:

For sound solid do I city PV power project using woodland reform pilot work, according to national forestry Council on PV power station construction using woodland about problem of notification (buying sent [2015]153,), and Shanxi province Forestry Office on carried out PV power project using woodland reform pilot of implementation views (jinlinzi sent [2015]90,) file spirit, municipal government research developed has Datong PV power project using woodland reform pilot of implementation rules, now issued to you, Please carefully follow.

Datong city people’s Government Office

The December 8, 2015 

Chapter I General provisions

First article for speed up Datong economic health development, advance city PV power project construction, reference “Datong mining subsidence District National advanced technology PV model base” first first try of mode, ensure woodland quality has upgrade, and foresters income has increased, and economic development has breakthrough, according to People’s Republic of China forest, and People’s Republic of China anti-sand sand method, and Shanxi province Forestry Office on carried out PV power project using woodland reform pilot of implementation views (jinlinzi sent [2015]90,) and National photovoltaic demonstration base of advanced technology in Datong coal mining subsidence area provisions such as the project management approach, combined with the practical, these rules are formulated, Datong city, and set up PV power generation projects to use forest land reform leading group (list attached).

PV power generation projects in Datong city mentioned in the second article of the rules of construction, means in the context of the jurisdiction of Datong city.

PV projects adhere to the basic principle of article III. “Lin Guang complementary integration” model, scientific planning, comprehensive protection, rational use, who hire who who develops protection compensation and who undermine the principle of who recovered. Biological measures such as by planting trees to restore and maintain the ecological balance, natural disaster prevention and mitigation, ensuring ecological safety.

The Fourth District and county administrative departments according to their respective functions and powers, responsible for accomplishment of photovoltaic power generation project management of regional ecological protection and municipal administrative authorities responsible for the supervision.

Fifth of municipal, district and county governments should strengthen ecological protection and management leadership, establish and perfect the responsibility system of protection.

Chapter two preconditions

Sixth Lin Guang complementary array PV projects use woodlands, annual rainfall regional coverage of less than 30% 400mm shrub and annual rainfall is more than 400mm regional coverage below the 50% shrub, forests and wood-free forest, other such prohibited use.

Seventh bracket PV array must use steel column-or cylinder-shaped cement block to ensure forest properties does not change;

Eighth PV array bracket minimum height of not less than 1.5 metres;

Nineth PV array spacing at 6 meters or more.

Chapter III Basic programs

The tenth enterprise applications. Photovoltaic power generation enterprise project registration certificate of the provincial development and Reform Commission and after obtaining the building site submissions, parties may apply to the pilot project to the county-level Government Department.

(A) be included in Datong coal mining district of the municipal development and Reform Commission approved the national advanced technology solar PV projects in the demonstration base, may make an application directly to the County Government forestry authorities, submitted to the municipal reform leading Group Office.

(B) the Datong coal mining subsidence, not included in national demonstration base of advanced technology solar PV power generation projects, enterprises must file an application to the county people’s Governments, by consent, county-level forestry administrative departments of first instance, qualify and raise, after municipal reform leading Group Office for approval and record.

After the 11th approved PV enterprises, to entrust qualified units as required to develop projects involving leases, the feasibility report of using forest lands, hiring record of the PV project leased forest land protection and enhance the quality of programme (hereinafter the programme). The report and approval by the local forestry authorities at the county level for examination and then submitted to the municipal reform leading Group Office (City Forestry Bureau, forest resources management section), the municipal Bureau of forestry organizations on the feasibility report, the programme review demonstration. Qualified, approved the record.

12th signing rental contracts, condominium-building accounts. Photovoltaic power generation enterprises in accordance with the relevant data of the feasibility report forest land-use, signed lease contracts of forest land and forest owners. And with the County Forestry Administration Department of forestry eco-restoration margin management account, deposit by deposit the full amount of 3000 Yuan/mu of ecological restoration.

13th signed the memorandum of ecological protection. Photovoltaic power generation after the program finished in the early, with the County Department of forestry administration signed the memorandum of ecological protection, a set of three copies, signed and each holding a copy, municipal reform leading Group Office archives for record copies.

14th for the administrative licensing procedures. Need handle temporary sex or permanent occupied woodland of PV power Enterprise delegate has qualification of units prepared project involved rental, and using woodland of site identification report, together with rental and using woodland of feasibility report, and assessment views, and project application file, and woodland using application table and rental contract, by permission law according to rules to district, and County, and city forestry administrative competent sector submitted material, handle project temporary, and permanent using woodland license procedures.

15th construction of photovoltaic power plant. Enterprises in the course of construction, strict construction in accordance with technical specification for construction, district and county administrative departments in charge of forestry conservation management in the project area, and hire qualified supervision company to regulate the enterprises construction process, as found during the construction of acts of destroying forest resources, as the case dealt with according to law, and reported to the Department of forestry administration.

16th the Organization and implementation of the programme. Photovoltaic power generation enterprises in the project after the project ended, commissioned a qualified unit project of replanting replant vegetation restoration project.

17th due restitution of forest land. PV enterprises temporary occupancy and PV array when the lease expires, requirements and standards of the enterprise in accordance with the contract, work on forest land-use and return to the forest owner.


Datong issued implementing rules of the photovoltaic power generation using forest land reform

Leading Group Office was set up Office in the Municipal Forestry Bureau, forest resources management section. Responsible for coordination of the pilot, a review of the project approval, forest protection and enhance the quality of programme audit record, supervision, report summary and so on.

Original title: Cosmos issued implementing rules of the photovoltaic power generation using forest land reform

Posted in Solar Charger.