784220d2.png

Henan province to be included in the 2016 guide scale PV power station project

Arctic star solar PV network news: according to Henan Province development and Reform Committee on forward straddling national development reform Board, and national energy Council on perfect PV power scale management and implemented competition way Configuration project of guide views and do 2016 PV power project construction of notification (Yu sent modified energy [2016]1169,) file requirements, I Board according to “law according to rules construction, and third party independent review, and village level poverty priority, and full grid timing, and fair just public” of mechanism and principles, Determine the 2016 poor small village PV power station (300KW~500KW) scale 67,000 kilowatts, through independent third-party spot verification 3 project 140,000-kilowatt, to be included in the 2016-guide scale PV power station in Henan province. Publicity (see annex).

During the publicity, if found to be incorrect or false, please provide written feedback, reflect the situation of the written materials should be specifically justified and relevant supporting documents. Please affix the official seal for security, contact, personal comments, please stay real name and contact information. Anonymous objection as inadmissible.

Publication deadline: January 4, 2017 January 6

Telephone: 0371-69691179

The January 3, 2017

To be included in the 2016-guide scale PV power station project in Henan province


Henan province, to be included in the 2016 guide scale PV power station project publicity

Original title: to be included in the 2016-PV power plant in Henan province guide scale project publicity

783b97c8.jpeg

Added to Jiangxi province in 2016 PV generation competitive allocation of result

Arctic star solar PV network news: according to national energy Council on adjustment 2016 years PV power construction scale about problem of notification (country can new can [2016]383,), about file requirements, Jiangxi province Energy Council delegate Jiangxi province Energy Association on I province 2016 years PV added plans carried out has competitive configuration selection work, determine anfu County Association Xin new energy, 48 a project selected, now to publicity (see annex), and on about matters description following:

First, the expert group according to project conditions, promises and general balance of indicators, and proposed adjustments to the selected construction part of the project. Enterprises should be based on project work in progress, a full assessment of investment risk caused projects not on June 30, 2017, the first grid-connected. Such as incorporation cannot be guaranteed due to various reasons, to Jiangxi province in the publicity Department of energy proposed redeployment plan. Include grid-connected and is not as appropriate as the enterprise’s credit.

Second, the competitive allocation of enterprises received quotes from 0.72-1.02 Yuan. Project through the competitive allocation of construction indicators, and was completed on June 30, 2017, electricity price according real offers implementation.

Third, the public announcement period from December 31 to January 3. Doubts about through the municipal development and Reform Commission (Energy Council, ban) reflected to the Jiangxi Provincial Bureau of energy.

Provincial Department of energy new energy Department Tel: 0791-88915227.

Annex: Jiangxi province in 2016 PV generation competitive allocation of the results table


Added to Jiangxi province in 2016 PV generation competitive allocation of result announcement

Original title: energy Bureau of Jiangxi province on 2016-addition of PV generation competitive allocation of result announcement

Jiangxi s photovoltaic investments speed limit

Polaris solar PV net news: recently, the Jiangxi Provincial Bureau of energy said overheated photovoltaic application development trends in our province, grid-connected photovoltaic applications follow accepted there will be greater pressure, easily abandon the phenomenon of optical power. To guide rational investment of PV power plant, and promote the sustained and healthy development of the photovoltaic industry, the province established a photovoltaic investment monitoring and early-warning mechanisms (for trial implementation).

According to statistics, photovoltaic and wind power installed capacity in the province now has more than the total installed capacity of 10%, some PV power over local power grid load. Energy analysis, in 2017 I PV Internet host will be more than “Thirteen-Five” total planning, photovoltaic power to dissolve gradually increased risk, risk local abandoned optical power, photovoltaic and grid capacity contradictions in the province has become increasingly prominent.

In order to provide the scientific basis for decision making, the provincial energy Board based on grid data and development planning, set up early-warning mechanisms, early-warning from high to low level are divided into red, Orange, green, three grades, based primarily on photovoltaic power generation investment indicators and policy indicators categories.

For the operation of the early warning mechanism, Energy Council, running indicator examines power to dissolve photovoltaic power capacity, policy indicators mainly on photovoltaic power generation planning and policy environment. Early warning results are in principle determined by the run indicator initial, amended by the policy indicators.

For example, running such indicators show that the local power grid to accept new projects without pressure, initial value for green, but local policy indicators are negative factors, such as photovoltaic power generation plan has been produced, not of first building, early warning results raised level, orange. Operation indicator shows that the local power grid to accept new projects there will be much pressure, initial values in Orange, but the local policy indicators for positive, downgraded in the early warning results for green. In addition, appears hoax project construction of counties (cities and districts), direct transfer to red.

Application of early warning results, the provincial Department of energy says, the result is red, PV power investment risk, provincial energy Board does not accept local competitive photovoltaic power station configuration, where you should stop new photovoltaic project for the record on the ground, at all levels of power grid enterprise network formalities no longer.

Early warning results for Orange, PV development investment has certain risks, Energy Council does not in principle receive competitive local PV power station configuration, place no longer count new terrestrial photovoltaic project for the record. Filing authority should carry out risk, Enterprise PV projects on poverty alleviation should be careful choices.

Early warning results for green is OK, has been completed and construction of photovoltaic power generation project planning and scale of less than counties and cities, local governments and enterprises according to national policy requirements, arrange for the construction of amount of distributed rooftop PV power station and village-level poverty alleviation power station, and photovoltaic power planning under the guidance of orderly participation of PV power generation project construction configurations.

This reporter has learned, the latest data shows, in monitoring the province’s 104 districts, municipal, district and development zone, photovoltaic power generation investment warning total of 78 results for green, Orange 23, Lianhua, Shicheng and hengfeng County is included in the red area.

Related news:

Jiangxi power Bureau on the establishment of photovoltaic power generation investment monitoring and early-warning mechanisms (for trial implementation) notice

Original title: photovoltaic power generation investment in our province “speed limit”

Solar thermal power generation the importance of breakthrough three banks

Polaris solar PV net news: first energy saving announcement a few days ago, the company’s first 24-hour electricity 10 megawatts of molten salt smooth incorporation of solar thermal power station Power Tower. The completion of the project comes as the first solar thermal power generation demonstration project bidding and construction of the occasion. The solar energy development issued by the National Energy Board “Thirteen-Five” programme also focus solar thermal power generation and first time solar-thermal power generation target of 5 million-kilowatt.

In the view of the industry, “Thirteen-Five” will be key to development of solar thermal, the basic task of industrial upgrading, reducing cost and increasing efficiency, implementation does not depend on State-subsidized marketing road to self-sustaining development. Expect “Thirteen-Five” period, solar-thermal power generation industry’s contribution to national economic output will exceed 600 billion yuan, and stimulate the development of high-end manufacturing, new materials and other industries. However, the solar thermal power industry is still facing inadequate resources, high initial investments costs and lack of operating experience and many other challenges.

Solar thermal project-intensive propulsion

Solar thermal power generation is using large arrays of parabolic or dish-shaped mirror collect solar heat through the heat exchanger steam, combined with the traditional process of turbo-generator, so as to achieve the purpose of power generation. According to the solar energy development “Thirteen-Five” programme, the “Thirteen-Five” period, solar energy generation capacity of more than 110 million kilowatts. Among them, solar-thermal power generation installed capacity up to 5 million-kilowatt.

After the national development and Reform Commission issued a notice, approved new benchmark model for solar thermal power generation after 1.15 yuan per kWh, total national energy Board announced 20 to 1.349 million kW in installed capacity of solar thermal power generation demonstration project. Industry insiders say, solar-thermal power generation industry has become “Thirteen-Five” field one of the highlights of the solar energy utilization. The plan clearly, the “Thirteen-Five” period, the solar thermal power will cost less than 0.8 Yuan/kWh, solar-thermal power generation efficiency and realize improved, form the entire value chain integration capabilities. In addition, solar-thermal power generation was promising another big reason is energy storage, stores extra calories during the day, evening and then stores the heat for power generation in order to ensure the continuity of power.

“After preliminary planning of the National Energy Board ‘ Thirteen-Five ‘ during the solar-thermal power generation target of 10 million-kilowatt. This means that over the next five years to light thermal power generation will reach 500 billion yuan of direct investment and indirect investment of more than 1 trillion yuan. But according to industry development, to be achieved by 2020 grid makes, later modified the grid target to 5 million-kilowatt. 5 million-kilowatt push hard to achieve without actually is small. “Beijing University of technology, Institute for energy and environmental engineering Professor Ma chongfang told China Securities Journal reporter.

Despite the difficulty of promoting large, the solar thermal industry starts year has a number of enterprises have started construction of thermal power stations. First energy conservation as an example, the company funded the construction of the country’s first 24-hour molten salt Tower power generating capacity of 10 megawatts of solar thermal power station on December 26 on-grid power generation. Huatai securities analyst He Xin pointed out that, if the full Internet, highest annual generating capacity of the project is expected to be up to about 85 million. Follow the published benchmark 1.15 Yuan/kWh electricity cost, can realize the electricity revenue of about 100 million Yuan for the year.

Apart from the tower outside the station, Haiyang 50 MW trough solar thermal power project in Yumen, Gansu province, started recently. In addition, the commercialization of world’s first molten salt Fresnel solar-thermal power station–Lanzhou, Dunhuang molten salt linear Fresnel 50 megawatts of solar thermal power generation demonstration project, a project started in Dunhuang, Gansu province.

At the time of solar-thermal power station-intensive start, upstream and downstream enterprises to actively participate in it. Tianjin Bai Rui Xue Lingyun, Chairman of new energy, said: “compared with the traditional trough solar thermal power generation systems, energy storage technologies-new power to reduce overall investment 30%. By molten salts in the preparation of improved, greatly reducing the cost of insulation, upgrading a molten-salt storage capacity, the company promising hot prospect. ”

Insufficient resources high initial cost

“Compared to photovoltaic, solar-thermal power generation of thermal storage technology, solar heat through the heat exchanger to heat water to produce steam and drive traditional steam turbine generator to produce electricity, ‘ light-heat-electricity ‘ transformation, compensate for the lack of PV energy storage, grid connected friendship is far superior to the PV. “Ma chongfang said.

However, MA chongfang, China Light and heat resources, solar-thermal power generation, environment adaptation and site limited industrial development objective problems that must be confronted. “Now need to establish collection mechanisms related to light and heat resources, solar radiation values will directly affect the cost of power generation, solar database to establish the perfect enterprise will be expanding the solar thermal business will provide direct assistance. ”

Apart from the lighting factors such as lack of resources, water resources, and technology competition, cost and lack of reliability, operating experience and so on, can also light industry development challenges.

“Solar thermal power generation is the most fatal problem high initial investment costs. “Solar thermal power generation senior scholar Zhang Jiancheng to the China Securities Journal said,” it is understood that the first solar-thermal power generation demonstration projects the initial investment in the 30,000 to 40,000 yuan per kilowatt, photovoltaic power generation initial investment has entered a million per kilowatt, wind power generation initial investments are probably also less than 10,000 yuan per kilowatt. Coal-fired power plants, the initial investment is lower, only 4000 to 5000 Yuan per kilowatt, and economic differences to some extent will affect the investments. ”

Is still at the initial stages of solar-thermal power generation in addition to the difficulties facing higher costs, the “localization rate is not high, electricity market reform, bidding and other factors but also industrial development problems that must be confronted. “Zhang Jiancheng said,” mirror key technology in the collector, collector, controls the country’s capacity to meet current needs, but the localization rate is generally low. It also increases the cost. ”

For example, he said, “with higher barriers set heat pipe technology, for example, buy a import collector General of 14,000 yuan. If the plant of domestic production as long as 3000 Yuan and a domestic price of imports mirror mirror one-third. ”

National Energy Board new and renewable energy Division Deputy Director Xing Yiteng said the future from the perspective of scientific and technological innovation to reduce the cost of solar thermal. First model item 1.15 Yuan/kWh of electricity prices, the State was averaging more than 0.9 Yuan. Electricity prices in other words now are mostly dependent on State subsidy support. Worth noting is that three types of PV bidding price has reached 0.61 Yuan/kWh, wind power is lower. “Solar thermal and solar and other clean energy competition in the short term, in the long run have to compete with traditional energy sources such as thermal power, so industry needs technological innovation to reduce costs. ”

“The future development of solar-thermal power generation industry possible disruptive new technologies. Current technology does not apply to Chinese industry, solar-thermal power generation experimental project is imminent. It is understood that the gezhouba group company in the experiment base of organizations related to light and heat, which are important to industry. “Ma chongfang told reporters.

Directly or indirectly stimulate investment

In addition, the operating experience deficiency is also currently the solar thermal industry is facing a lot of difficulties. Due to the lack of sophisticated matching system and actual operational experience, in order to avoid problems such as delays in completion, national development and Reform Commission, claim the model tariff first solar-thermal power generation projects to be fully operational before the December 31, 2018.

“If grid-connected to the end of 2018, this point of view, is expected in 2019 will step into a mature market stage. Along with the industrialization process, when costs go down, light electric prices will appear decreased substantially, when industry or shuffle a wave of surges, equipment vendors and operators will go through a consolidation of the project. “Haiyang in actual control of Xue Liming told China Securities Journal reporter.

However, insiders believe that grid-connected the end of 2018 there is tight. “At this stage a 50-megawatt power plant project, from construction to operation needs at least 2.5 years, national development and Reform Commission listed the ‘ end point ‘ is quite high. Of course, to have had relevant experience in building enterprise may be able to complete, but other companies can say to complete on time. “National solar thermal industry technology innovation Strategic Alliance Secretary General Liu Xiaobing said.

National Energy Board official said earlier that “Thirteen-Five” former mainly through promoting the construction of 1.5 million-kilowatt solar-thermal power generation demonstration projects, sum up experience, improve related management practices and policy environment, verify the reliability of domestic equipment, cultivation systems integration capabilities and key technology.

It is understood that due to varying degrees of domestic, solar-thermal power project unit kilowatt cost vary, usually spreads in the 20,000 to 30,000 yuan per kilowatt. In this context, if the total national energy Board first solar-thermal power generation demonstration projects 1.5 million-kilowatt project started, there can be between 30 billion and 45 billion investment market.

Industry experts estimate that the “Thirteen-Five” period, the solar thermal industry’s contribution to economic output will exceed one trillion yuan. Among them, the solar thermal power industry’s contribution to economic output will reach 600 billion yuan, boosting economic demand by 120 billion yuan a year on average while driving high-end manufacturing, new materials, electronics and related industries such as the Internet.

First energy-saving secret Tung Hou Jianfeng said in an interview, solar-thermal power generation in China lack operating experience, future will solar thermal collection and generation of organic interface, how to implement a mirror accurate day and stored and how to achieve the thermal storage tank of molten salt, which need to be proven in a specific operation. “By the end of 2015, only 18 MW solar thermal installed capacity in China to catch up with a large scale distributed PV power station. 2016 first solar thermal demonstration project in the reserves of the company’s projects have 1.6 GW, and follow-up projects have been started, solar-thermal power station systems integration, technical issues, the quality of domestic equipment can withstand the test, a power station operation is made to find the answer. ”

Original title: policy support project have launched solar-thermal power generation industry is an urgent need to break through the barrier

Polaris solar network on December 29 2016 news review

Polaris solar PV net news: Polaris solar PV NET summary highlights December 29, United States anti-dumping against China made of crystalline silicon photovoltaic cells early administrative review Conference, enterprises in how to deal with the PV “double reverse” disputes? 2017 new PV installed capacity 18 million-kilowatt, as follows:

United States anti-dumping against China made of crystalline silicon photovoltaic cells early administrative review Conference

How enterprises deal with PV in “double reverse” disputes?

2017 new PV installed capacity 18 million-kilowatt

List of the 2014, 2015 solar power projects in Guangdong Province (table)

Shandong zaozhuang 2016 construction scale of 12 options added to photovoltaic power generation project publicity

PV competitive allocation of Hunan province administrative measures

Tesla wants to Dagan in 2017, a SolarCity drag?

“Paper thin” 3D printing solar panels

In 2016, China clean energy consumption increase

Denmark solar auction price down to 1.81 cents per kWh

By 2020 the global solar cell market is expected to grow by 16%

Asia’s first molten salt around the clock tower-type solar thermal power incorporation electricity generation

World’s first solar Highway into the two-year test period (photos)

78445bbd.png

From 1 2GW small road to explore fine operation of PV

Polaris solar PV net news: (reporter Chen Yanqing) if PV power station 25-year life cycle of the input and recycling groups, early construction of the power plant siting, design, equipment selection and investment, which accounted for only six months or so. Late utility receipts obtained through plant shipped weilai, for more than 20 years, photovoltaic power plant operation and maintenance the importance is obvious.

Hit by the PV on-grid prices, more and more owners start photovoltaic operation and maintenance to optimize power plant, increase generating capacity, operations then ushered in the development of the market. First half of 2016, new PV installed capacity exceeds domestic 22GW, cumulative installed capacity breakthrough 63GW, photovoltaic operation and maintenance (data + maintenance) costs accounted for power station 1%, to cost 7.2/w to calculate PV power station, operation cost about 0.072/w, operations exceeded 4 billion yuan market scale.

Market under positive, photovoltaic operation performance is also doing well. According to Qingdao Sanas intelligent technology Corporation introduced, by the end of 2016, Sanas total PV power plant operation and maintenance 1.2GW, practical controls access amounted to 2GW, Sanas 1.2GW operation and maintenance capacity is called the target, behind small targets, is the development of operations enterprises market to develop.

PV of “transport” and “dimensions”

In recent years, with the goal of development of photovoltaic operation and maintenance of the photovoltaic industry is constantly changing. 2009-2013 “Golden Sun” project, photovoltaic operation and maintenance most stays in the checking equipment in good condition, wipe boards primary stage of 2013-2015, based on kilowatt photovoltaic operation and maintenance to the power station was opened under the subsidy income phase from 2015 onwards, photovoltaic power plant operation and maintenance more seeking refinement, plant asset management.

PV-the initial stage of operation, operation means more single, maintenance mainly cleaning components, inspection station and so on. At the time, cleaning the panels take more manual cleaning not only trouble trouble, increased labor costs. Photovoltaic operation and maintenance company, the traditional manual or semi-automatic cleaning mechanical cleaning costs about 2-2.50,000//10MW. Inspection of photovoltaic power station is a major project, especially the scale of hundred megawatt power station in Northwest China, took almost 1 month, if your device requires repair replacement, operation time will be extended further, photovoltaic generating capacity will be greatly reduced.

The past two years, “the Internet +” further catalytic, photovoltaic power plant operation and maintenance towards intelligent occurred PV cleaning robot, unmanned aerial vehicles and other advanced equipment. PV enterprises adopted operation mode is also more diversified, the emergence of a simple monitoring system, inverters and other devices to provide solutions, as well as from the beginning of construction of the power station involved, provides power monitoring, maintenance and other integrated services model, operational enterprises is related to equipment, software, communications and other fields.

Sanas from 2010 to enter the field of PV, 6 years to conform to the PV market changing, gradually forming a photovoltaic power plant lifecycle management system, covering the siting of PV power station, power station equipment, power station construction and power plant after the completion of the monitoring, inspection and maintenance, and so on, through online and offline interaction patterns, management of the power station.

In complex terrain and difficult to achieve in the operation and maintenance inspection inspection frequency, manual inspection blind spot became a hotbed of power failure. In this regard, Sanas r ordered unmanned to complete the inspection work. Not long ago, Sanas self-developed UAV has completed all of the annual inspection of the power station. Sanas staff, the drone patrol component a total 1GW, a case study of Qingdao local solar project 40MWp, patrol lasted 7 days, higher than the average efficiency of manual inspection 300% (40MW power manual inspection normally take approximately 30 days). In future, Sanas drones patrol from the pilot phase formally entered into the normal inspection.


From 1.2GW small road to explore fine operation of PV

Sanas drones patrol

Fine photovoltaic operation and maintenance how to do?

Power plant owners increasingly high demands for meticulous management in power plant, photovoltaic power plant operations also need to be more detailed. Such as operation and maintenance of the current operational market process is difficult to control, and operations teams are not professional, operational effectiveness difficult to quantify problems such as restricted operation market developments hinder power plant fine management.

For above industry pain points, Sanas take double sector checks and balances management mode, through tube Control Department and shipped dimension Department mutual checks and balances, shipped dimension Department according to project points concentrated type and the distributed shipped dimension, and each project in programme approached and implementation process in the are has specifically of technology group constantly followed up; tube Control Department to drop this increase for principles, under system, and security and the cost tube control, using independent development of monitoring operation platform on shipped dimension Department implementation periodic supervision check, developed standard and urged implementation, maximum reduced shipped dimension process in the of security risk, Ensure proper compliance.

Transition from traditional people-oriented mode of operation to supplement to human intelligence operations, operations staff is indispensable but flawed to some extent, the improper operation of the operations staff will affect the result of photovoltaic operation and maintenance. Currently industry operations enterprise related operation and maintenance manuals and management standards to regulate the PV power plant operation and maintenance processes.

Sanas staff, Sanas intelligent power plant equipments no blind spot in data acquisition, monitoring, visualization video operation. And to regulate the matter of content inspection, inspection, a standardized template for all operations staff to check and clear inspection of the content, avoid omissions.


From 1.2GW small road to explore fine operation of PV

Photovoltaic power plant operation and maintenance based on safe, according to reports, Sanas from 2011 establishment operation and maintenance team of the early professional safety training and exercises, and by 2016, has established a set of mature security control system and set up security posts, plant safety, safety training, safety audits, technical support, remote diagnosis are given better support. By the end of 2016, a total of 384 organizational security training, security 162 times, training covers transformers, switching processes, emergency simulation exercises, personnel electric shock, fire safety drills.


From 1.2GW small road to explore fine operation of PV

Recently, the State development and Reform Commission issued a document, January 1, 2017, new benchmark PV prices fall further, three resource areas prices were 0.65 and 0.75 0.85 Yuan per kilowatt hour, which means that our PV step closer to parity, but also means that the earnings power plant owners would be hit.

Photovoltaic operation enterprise, opportunity and challenge of 2017. Sanas officials say, 2017 Sanas in operations management, safe operation, leading technology, power generation efficiency and four deep, for power plant owners benefits continue to escort.

7844e4cc.jpeg

Yanqing district distributed PV project list of alternative products second

Arctic star solar PV network news: to strengthening I district PV power engineering quality management, guarantee PV power market of Health ordered development, I Board released has on collection 2016 degrees Beijing yanqing district distributed PV power project alternative products directory (second batch) of notification, by Enterprise voluntary application and third party institutions on application information of strictly review, now will meet conditions of 10 home component Enterprise, 42 species component model; 6 home inverse variable device enterprise, 16 species inverse variable device model (see annex) be announced. Dynamic management in the list of alternative products, enterprises can scale certification center to Beijing to submit the application materials at any time, I will review alternative product batches release directory.

Yanqing district in Beijing development and Reform Commission

The December 29, 2016


Yanqing district distributed PV project list of alternative products (second batch)

Original title: on the release of the yanqing district of Beijing distributed PV project list of alternative products (second batch) notice on the

7841d59c.jpeg

United States 2016 PV cost 4 9 6 1 cents kWh

Polaris solar PV net news: United States consulting firm Lazard annual assessment of United States energy life-cycle cost (LCOE), 10th report was published on December 15, 2016. A chart in the report shows since 2009 United States wind power and PV costs decline.


United States 2016 PV cost 4.9-6.1 cents/kWh

Overall, 7 years since United States levelized cost of onshore wind power cycle (LCOE) by 66%, current cost range of 3.2-6.2 cents per kilowatt hour (equivalent to 0.22-0.43 Yuan/kWh). 7 years of large terrestrial PV LCOE down 85%, current cost range from 4.9-6.1 cents/kWh (equivalent to RMB 0.34 to 0.42/kWh), residents and businesses of rooftop PV cost range 8.8-19.3 cents/kWh (equivalent to 0.61-1.33 Yuan/kWh).

Original title: 2016: United States chengbenqu 3.2-6.2 cents/kWh of wind power, photovoltaic cost 4.9-6.1 cents/kWh

78476025.jpeg

2016 years Shaanxi Province photovoltaic power generation project competitive

Polaris solar PV net news: entrusted by the provincial energy Bureau, Shaanxi Province Engineering Consulting Center and Northwest hydroelectric investigation, design and Research Institute of China electric power construction group in organizing the 2016 PV power generation projects on the basis of competitive selection, organized jointly by December 29, 2016, industry management, engineering technology, discipline inspection and supervision of experts to review the project and form the review comments. In accordance with provincial energy Board about 2016 photovoltaic power generation project in Shaanxi Province issued notice of a competition configuration approach (Shaanxi new energy (2016), 13th), Shaanxi Province in 2016 are the photovoltaic project competitive selection result announcement form, 2016 solar power competitive in the Shaanxi Province intends to increase publicity of the project we compare form of publicity. Publicity from December 29, 2016 to December 31, 2016. Such as publicized dispute, please name reported in writing, and sent to the provincial Engineering Consulting Center.

Contact person: Yu Wei, and Dang Jiangping

Phone: 029-8623441186269490


2016 years, Shaanxi Province, photovoltaic power generation project competitive selection result announcement

2016 years, Shaanxi Province, photovoltaic power generation project competitive selection result announcement

Original title: 2016 photovoltaic power generation project in Shaanxi Province competitive selection result announcement notification

784e0fd2.jpeg

Qinghai power grid 10 November two rules assessment of compensation

Arctic star solar PV network news: according to on issued < northwest regional power plant grid run management implementation rules > and the < northwest regional grid power factory auxiliary service management implementation rules > of notification (Northwest prison can market (2015) 28th,) provides, October 2016 and November Qinghai grid power plant grid assessment and auxiliary service compensation results completed review work, now to announced, please according to annex settlement.

October 2016 Qinghai power grid “rules for the two” test results


Qinghai power grid 10-November

November 2016 Qinghai power grid “rules for the two” test results


Qinghai power grid 10-November

Original title: Qinghai power grid 10-November “two rules” assessment notification compensation

Polaris solar PV net news featured a week 12 26 12 30

Polaris solar PV net news: policy review

1. the “policy of the original” national development and Reform Commission on adjusting the PV new benchmark onshore wind power price notification

According to the new energy and industrial technology progress and cost reductions, reduced after January 1, 2017, the new photovoltaic onshore wind and approved after January 1, 2018, a new building benchmark price, the specific price see annex 1 and annex 2. Before 2018 if significant changes in the new onshore wind project construction cost, countries can be adjusted according to the actual situation the benchmark price.

For more details

2. Shandong development and Reform Commission issued the 2016 PV power generation projects informed by the competitive allocation of programme of work

In accordance with national requirements, this reporting project by December 31, 2016 and network into, not into nation-building-scale PV project, or have been substantive work and also on June 30, 2017 and network into, not into nation-building-scale PV project (grid-connected to power grid enterprises acceptance date shall prevail). Taking into account our province’s land resources, grid access and eliminate, scale of national distribution and other factors, a single project construction in principle no more than 30,000-kilowatt.

For more details

3. the Anhui Province in 2016 General up-scale PV power station configuration project competitive selection announcement before December 31 on 9:30 list closed

2016 General up-scale PV power station in Anhui Province as 500,000-kilowatt, grid-connected applicants for projects by December 31, 2016, or have been substantive work and also on June 30, 2017-grid projects.

For more details

4. the NDRC on 2016-photovoltaic pilot project in Hainan Province work notice

According to the Hainan Province “Thirteen-Five” energy plan the photovoltaic power control set, a single pilot project construction not exceeding 50,000-kilowatt, a single scale of village PV power plant project for poverty alleviation does not exceed 300-kilowatt.

For more details

5. Heilongjiang 2016 ground added incentives of photovoltaic power station scale competition configuration candidate publicity

China International engineering consulting firm commissioned by the Heilongjiang provincial development and Reform Commission, 2016 ground added reward scale PV power station project in Heilongjiang province construction investment, configured by a market appraisal of open, fair and equitable competition, determined the following units as a candidate:

For more details

6. Zhejiang on 2016-size added to ordinary terrestrial photovoltaic power station in the province a competitive allocation notice

Chunan well-off village of ground engineering in 29 counties, such as photovoltaic power station and centralized power plants, according to the National Energy Board issued in conjunction with common scale PV power station construction management in our province. County or town in the County as a unit, package in the provinces involved in the project competition.

For more details

7. Hubei Province Energy Council Declaration of 2016-PV up-scale emergency notification

According to national energy Council on adjustment 2016 years PV power station construction scale about problem of notification (country can new can (2016) No. 383,) requirements, combined I province General PV power station construction situation, by province Energy Council Secretary Office will research, decided carried out 2016 degrees PV power station additional scale declared work, this times intends to national declared additional scale index 1 million-kilowatt, through competition way distribution.

For more details

Market review

1. the European Union intended to renew China’s PV “double reverse” corporate curve of tax avoidance

The Ministry Web site, December 22, on December 20, the European Commission published on China’s anti-dumping countervailing sunset PV products review and the findings of the midterm review disclosure documents and intend to continue anti-dumping countervailing measures imposed on China PV products, it is recommended to extend the double reverse two years. Meanwhile, cut price MIP (solar minimum price agreement).

For more details

2.11 months Korea 63.7% polysilicon soaring exports to China accounted for more than 61.6% hits new high

According to the latest customs statistics, in November 2016, China imports increased sharply to 13584 tons of polysilicon, rose 56.5%, an increase of 35.5%. 2016 as of November, the cumulative imports reached 125798 tons, an increase of 18.2%, the average monthly import volume in 11436 tons.

For more details

3. the United States to China beginning of crystalline silicon PV cells made of antidumping administrative review Conference (2014-2015)

December 22, 2016, United States Commerce released announcement said, on imports since China of crystal silicon PV battery made anti-dumping administrative review early CD, preliminary ruled: (1) 7 home involved enterprise in this times administrative review survey period within no can review trading (Enterprise list see schedule 1); (2) 26 home involved Enterprise (Enterprise list see schedule 2) applies Yu 7.72%~30.42% of separate tax;

For more details

4. West PV long-term solution lies in-place to dissolve

Over the years, “West to East” are the main Western region power delivery channel. Insiders told reporters that under the current economic downward pressure, overall electricity demand declined in the eastern region, which makes East West power there are a slow dissolve. The next few years, including new energy, such as solar electricity delivery in the West will be gradually reduced, this will adversely affect power cracked up light in the Western region. So, large photovoltaic power plant in the Western region will go from here?

For more details

5. distributed PV project in yanqing directory of alternative products (second batch)

To strengthening I district PV power engineering quality management, guarantee PV power market of Health ordered development, I Board released has on collection 2016 degrees Beijing yanqing district distributed PV power project alternative products directory (second batch) of notification, by Enterprise voluntary application and third party institutions on application information of strictly review, now will meet conditions of 10 home component Enterprise, 42 species component model; 6 home inverse variable device enterprise, 16 species inverse variable device model (see annex) be announced.

For more details

Enterprise version

1.-minded technology intended to control PV business scale for 400 million in field of automotive micro-motors

A few days ago, kuangda technology announced that in order to comply with the company’s strategic transformation and development needs, companies wholly-owned subsidiary Quantm new energy investment limited with the relevant parties signed the framework agreement on investment. Company not expected to exceed 400 million yuan of investment, acquisition-related company equity intervention vehicle micro-motor production and sales areas.

For more details

2. Tesla joint production next year, Panasonic PV solar panel

Two major car makers Panasonic and Tesla announced on 27th, both sides have decided that from next year in the New York State factory production of photovoltaic cells and modules.

For more details

3. Tesla wants to Dagan in 2017, a SolarCity drag?

Recent news that, though Tesla in 2017, new car program appears to be flat, and has a super battery plant is put into operation and automatic driving feature further improved, but it still faces a number of potential problems, for example solar energy provider SolarCity.

For more details

4. at Shenhua and Shanghai Electric group to form solar company

Shanghai Electric’s announcement, company with Shenhua group and ManzAG “the technology of Copper-Indium-Gallium-Selenium” to cooperate. Intends to establish Shenhua (Beijing) Shenhua Chongqing technology and thin-film solar photovoltaic technology co., Ltd.

For more details

International articles

1.2016-United States PV installed capacity is estimated to reach 14GW 70% for large ground station

United States PV installed capacity up to 4.143GW in the third quarter (which California installed more than 1GW), compared to 99% for the second quarter of this year, compared to last year’s third quarter growth as high as 191%. This is United States history quarterly PV installed capacity record-one for every 32 minutes on the completion of the 1 MW of installed capacity. First quarter to the third quarter of 2016, PV installed capacity accounts for America’s new electricity installed capacity of 39%, second only to the capacity of natural gas increases.

For more details

2. Denmark solar auction price down to 1.81 cents per kWh

Denmark Pure&BetterEnergy renewable energy developers in the latest cross-border sale of a 20 MW solar photovoltaic generation capacity costs of 12.89 Denmark CZK/MWh, solar power price competitive in Europe.

For more details

3. Ethiopia 2017 added 5000MW renewable 3 solar power station project

Ethiopian Ministry has announced that in 2017, Ethiopia will launch a number of renewable energy projects, accumulated over 5000 MW of installed capacity.

For more details

Shanxi Jincheng science and Technology Council canceled large Sun local solar

Polaris solar PV net news: counties (cities, districts) science and Technology Bureau, the Economic Development Board, all the parties involved:

Network query, Jincheng city, master Sun power company again in 2016 is inclusion of the Supreme People’s Court, “lose the trust of the people” list. Under the Jincheng City Bureau of science and technology on the PV for the record companies to strengthen integrity in the management of “has been classified as a local photovoltaic products for the record companies, break records again in the course of business, permanently cancel the qualification of PV for the record company” requirements, through research, from the date of notification issued to cancel the company’s local qualification of PV for the record companies. Our purchased Shuo Sun photovoltaic components but not invoiced by the user before the end of January 2017 to master sunshine power company invoicing.

Jincheng City Bureau of science and technology

The December 29, 2016

Original title: Jincheng City Bureau of science and technology on canceling Shuo Sun electric company’s local photovoltaic companies filing notice of eligibility

78483c56.png

2016 solar investment cost of developing countries for the first time below

Polaris solar PV net news: it is often for wind power and PV costs compared with conventional energy sources, compared to the cost of wind power and photovoltaic itself is the kind of situation? According to Bloomberg new energy finance, including China, India, and Brazil, in 58 developing countries survey, as of third quarter of 2016, investment in solar photovoltaic projects in these countries the average asking price is $1.65/w, while wind power project investment offer for an average of $1.66/w. Solar investment cost only a wind twice times 5 years ago, is now just below the wind for the first time, it is a historical leap.

Of course, the above data statistics in 58 developing countries, but only for investment investment cost per watt. If you look at the whole life-cycle cost (LCOE), wind power equipment utilization rate is generally higher than solar, wind power cost is still lower than the PV. For example in the United States, the current wind turbine cost range 3.2-6.2 cents/kWh LCOE, while large terrestrial PV LCOE costs range from 4.9-6.1 cents/kWh.


2016 solar investment cost of developing countries for the first time below the wind!

Original title: 2016 solar investment cost of developing countries for the first time below the wind!

Subsidy deal landed fired heat distributed and energy storage markets

Polaris solar PV net news: (reporter Wang Shasha) on December 28, the official notice of the national development and Reform Commission in 2017, photovoltaic one to three categories of resources to new benchmark of new power stations price adjusted to 0.65 per kilowatt hour, 0.85, 0.75 Yuan in 2016, down 0.15, 0.13 Yuan, 0.13 Yuan, respectively. Although the official notification was not distributed, but in the interpretation of the price clearly distributed in photovoltaic subsidy does not adjust, proceed to 0.42 Yuan per kWh up standards in the country. This means that policy continues to guide distributed ground station than subsidy cuts in succession, country, fill, fill overlay fill, and even distributed PV counties make up “money scene” more attractive.

For now, of course, distributed PV in China is still seeking a mature business model, slow the development process, and to beware of a lot of impact on power grid. Solid in Jiangsu Dewei power technology Corporation General Manager, min, along with the falling cost of storage, distributed PV + energy storage will become the future mainstream form.

Distributed PV focus returns

According to the national development and Reform Commission, the National Energy Board had previously released the power development “Thirteen-Five” programme, the “Thirteen-Five” period, distributed PV scale in China is more than 60 million-kilowatt, that is, each of the next five years will be about 10 million-kilowatt distributed machine.

Market vision to realize key benefits. “PV ˙ science and technology ˙ the future” Forum, the new dimensional intelligent power engineer Wang Shujuan, distributed PV project benefits and policies, quality, safety, cost and energy efficiency are at stake, especially as policy-oriented industry, pricing policies around the PV project direction.

Distributed solar projects are “spontaneous use, more than power” and “full Internet” mode. Spontaneously their own price (Yuan/degree, the same below) = base price +0.42+ local subsidies, over power price = desulfurization of coal-electricity price in the local +0.42+ local subsidies; and the full price is benchmark price.

Shujuan Wang introduced, according to the market-based price minimum is about 0.5 Yuan, up to 1.5 Yuan, desulfurized coal-electricity price of 0.25~0.45 Yuan, then spontaneously use receipts =0.5~1.5+0.42+ local =0.92~1.92+ local subsidies subsidies, the more power return =0.25~0.45+0.42+ local =0.67~0.87+ local subsidies subsidies. By this calculation, 2017 “spontaneous use, more than power” mode income is clearly higher than that of full Internet access 0.65, 0.75, 0.85 Yuan/degrees, gradually eastward bias that explains solar pattern distributed the root cause.

Full Internet access, compared with solar subsidy cut, and leave light risk to project, Wang Shujuan stressed that “spontaneous use, more than power” mode of distributed PV project risk is low, mainly because user electricity price cut, and charge problems faced by industrial and commercial projects, high-credit users will compete for the object.

Electricity price subsidies, photovoltaic equipment, PV system design, proper operation and maintenance is the key to protection distributed PV projects.

Storage value dependent on cost reduction

Distributed outside storage industries is recognized as the industry’s other big potential markets. Starting from the second half of 2015, PV inverters in particular enterprises have started to raise energy. This area is photovoltaic power output of large stochastic volatility, reliable grid energy storage system on the other, with open electricity market reform in power, photovoltaic grid-connected and added storage will not only solve problems and build new business models.

BYD introduced daixiangjun, Director of product development for energy storage, 2024-storage system investment in 2016 will be increased on the basis of 6 times to $8.2 billion, global storage system capacity will be about 45 million-kilowatt. Energy storage device’s core market of the future will be Japan, and India and the United States, China and the five European major markets that account for 71% of global energy storage devices by 2014.

“However, prices do not accept it, value is not reflected. Energy storage industry is at this stage. “Germany TÜV Rheinland Group greater China General Manager Li Weichun said.

And observations from the international market, battery storage with the roll out of home market in rapid decline. Media reports in Australia, “PV + Tesla batteries + power” supply cost is slightly lower than from grid electricity purchase with “solar + energy storage” can basically meet the demand.

Lu Jinjun, Deputy Director of solid Dowell Research Center pointed out that household storage system within Germany, and Japan and the United States, and Australia and other markets developed rapidly, except that it can save electricity, a main driving factor is subsidies.

Focus on the domestic market, Lu Jinjun family of six villas in Beijing as an example, if Wei energy storage devices, equipped with solid +SEMSHome home energy management system, can save electricity more than 3,400 Yuan a year. In his view, with the opening of electricity markets, distributing + storage advantages will be more prominent, broke out looks forward to future energy storage in support of national subsidies.

PV competitive allocation of Hunan province administrative measures

Polaris solar PV net news: Chapter I General provisions

First to standardize the PV market development and construction order in our province, optimizing the allocation of resources, in accordance with the national development and Reform Commission and the State Energy Board on improving the PV scale management and ways of introducing competition to configure the project’s guidelines (the change in energy (2016), 1163th), these measures are formulated.

Second common PV power plant project, not including photovoltaic power generation led technology demonstration bases, PV poverty and fixing roofs, walls and subsidiary sites construction of photovoltaic power generation projects, as well as all the spontaneous use of PV power plant project on the ground.

PV third ordinary competitive allocation (hereinafter referred to as competitive allocation) optimally. Optimization work according to law compliance, follow the open, fair and equitable, mature early work priorities, comprehensive utilization of resources, technology and efficiency priority principle of priority, out scoring.

Chapter project application

Fourth article participate in optimization of project should provides related information and annex, including record file, land, and planning, and water, and flood control and power, sector reply views, land (woodland, and water) rental agreement, enterprise performance qualification,, and since score table, and related proved material, (involved completed engineering volume of also needed provides construction contract, and funds paid voucher,) and stamped Enterprise seal. Project documents in triplicate.

Article fifth project comprehensive use of resources, the implementation of programmes should be technically and economically feasible. Complementary projects should provide agricultural construction programmes and agricultural cooperation and company-related information; fishing light complementary projects should be made flood control evaluation approval sites should avoid the wetland protected areas such as national building area; Lin Guang complementary project woodland approvals should be obtained.

Article sixth project should contribute to regional economic development, to improve the efficiency of land utilization, to technological progress and cost reductions, and conducive to the healthy and sustainable development of the photovoltaic industry.

Chapter selection assessment

Seventh optimization score work includes price assessments, project evaluation, programme evaluation, project implementation performance evaluation and enterprise’s investment evaluation in five parts, a total of 100 points; a separate plus and minus points. Specific content of Hunan province, described in the PV power plant project selection criteria form (annex 1).

Article eighth Hunan provincial Commission of development and reform (energy Bureau of Hunan province) (hereinafter referred to as provincial development and Reform Commission (energy), according to the State’s general annual PV power station construction, organize annual selection of construction project work.

Nineth all municipal development and reform Department in accordance with unified work arrangements and organization in each County (city, district) the first instance of enterprise reporting projects and data, ensuring the authenticity of items and information, and filter after sorting the project submitted to the provincial development and Reform Commission (energy).

Tenth provincial development and Reform Commission (Department of energy) to collect project commissioned a third party review. Third parties strictly in accordance with the standard, project materials and business self rating score, fill out the score sheets (see annex 2), and issue a written review comments.

Article 11th party delegate from Hunan province to assess institutional repository “(new energy) professional” selected according to the requirements and related costs paid by the provincial development and Reform Commission in accordance with the relevant provisions, no unit or individual is allowed to collect any fees for any reason.

12th provincial development and Reform Commission (Department of energy) to third party written comments submitted to the Director of the provincial development and Reform Commission Office will focus on the consideration, considered by the provincial development and Reform Commission after the portal site published.

13th provincial development and Reform Commission (Department of energy) based on the review comments and the results of publicity, building scale into specific projects, formation issued annual construction programme.

The fourth chapter supervision and inspection

14th optimization work organized by the provincial development and Reform Commission (Department of energy) Disciplinary Committee monitored and subject to public supervision.

Clause 15th annual implementation plan of the project should be implemented strictly in accordance with the National Energy Board on renewable power generation project notice of information management (new [2015]358) require, in the National Department of energy renewable energy generation project management information management platform.

Clause 16th annual implementation programme project investors, shareholders and equity, as well as building size, building site construction shall not alter. As adjusted due to mergers and acquisitions, in the same Division of labor within the Group and other reasons, the need to change investment or equity, shall be governed by the relevant provisions of the strict implementation of change.

Clause 17th annual implementation programme projects, shall, within the prescribed period a substantial construction. Project a substantial pile of construction engineering based, bracket, switching station (distribution) building.

18th provincial Department of energy project construction progress schedules and site inspection carried out on a regular basis, without conditions, failing to start the construction building and construction projects lag adjusted in due time, recover the construction scale of adjustment for other work or work more to improve the project in the early. Correlation of increased construction work shall conform to the provisions of these measures.

19th energy regulator to implementation of project construction supervision.

The fifth chapter by-laws

20th article of the approach will be based on national and provincial policy changes improve in due course.

21st article this way by the Hunan provincial development and Reform Commission is responsible for the interpretation.

22nd article this way come into force on the date of promulgation.

Annex: 1, Hunan province PV power plant project selection criteria

A total of 100 points, a total of five items; a separate plus and minus points.

First, price (25 points)

Commitment than nationally determined benchmark price for photovoltaic power generation Internet of our province, decreased 0.01 Yuan/degree, 5 points. Up to 25 minutes.

Second, the preliminary work of the project (30 points)

1, the project shall obtain land, planning, environmental protection, forestry, water conservancy and electric power sectors reply comments. Among them, the corresponding approval of the competent departments of the planning, environmental protection, and 2 points, respectively; access to land, forestry, water conservancy and power access to the approval of the competent departments, such as, respectively, 5 points.

2, signed a land (forest, water) formal agreement of lease contract and an advance of the rent or a security deposit (6 points); just sign the formal rental contract agreement but not paying rent or a security deposit (3 points), owned land (forest, water) ownership certificate (6 points). This does not repeat points.

Third, project implementation plans (30 points)

Projects need to have relevant qualification project implementation plans prepared by the design unit, includes project profiles, company profiles, technical programmes, economic analysis, comprehensive utilization of land, major progress was made in the performance, commitment, and so on.

1, comprehensive utilization of land (15 minutes)

Nong Guang, Lin Guang complementary projects. Component design and installation of high agricultural and forestry planting and spacing to achieve technical requirements (5 points). Set up agriculture, forestry companies, or formal agriculture, cooperation agreements on forestry and agriculture, forestry programmes (10 points).

Yue Kwong complementary projects. Component design and installation height and distance to reach aquaculture technical requirements (5 points). Establishment of fish farming companies or sign an agency contract (5 points). Preparation of flood control evaluation and approval by the competent departments (5 points).

Use of hills, slopes, beaches and unused land, wasteland and other ground station (10 minutes).

This does not repeat points.

2, the use of equipment performance (8)

Main equipment selection in the project implementation plan explicitly intends to select PV modules and grid-connected inverters should meet the standard conditions of the PV manufacturing industry relevant technical product specification requirements (5 points) and other advanced technologies (3 points).

3, the construction schedule (7 points)

Commitment into implementation programmes within 2 months after commencement of project construction and grid-connected power generation that year (7 points), committed to projects in the implementation of programmes within 3 months after construction and grid-connected power generation that year (5 points).

Four, enterprise performance (9 points)

1, has been built 5 MW grid-connected distributed PV projects above or more than 50 households rooftop PV projects (including photovoltaic projects) (project registration certificate are required, electricity invoices, outside the province, the project will provide the local provincial energy departments to include power plant scale index of related files, such as documents) (4)

2, have been built centralized PV (photovoltaic project is not included) (project registration certificate are required, electricity invoices, outside the province, the project will provide the local provincial energy departments to include power plant scale index of related files, such as documentation) (5 points)

Five, business investment (6)

1, the enterprise has good investment performance, PV module, or inverter, electric equipment production capacity. (2)

2, the enterprise has good financial strength, capital (project total investment 30%) documentation and proof of financing. (2)

3, to provide related accessories, including the business license of the company (parent company stamped with the seal of the parent company), copy of ID, proof of credit ratings, since scoring tables, each missing a minus 1, minus lasts. (2)

Six, plus

1, the project location or poor villages in poor counties, “green counties”, green energy demonstration, plus 2 points.

2, the project has substantial work, including pile foundation construction, substation construction and construction support, 10 points.

Seven and points deducted

1, have been incorporated into our province in 2014, 2015 and 2016 PV implementation programmes but did not start the project of enterprise total minus 10 points.

2, data falsification, privately scalping indicators of irregularities, such as outright cancellation of award eligibility.

Annex 2: PV Hunan province competitive allocation table

Original title: Hunan provincial development and Reform Commission on issuing the PV Hunan Province Regulation on competitive allocation notice

784c18f8.jpeg

United States anti dumping against China made of crystalline silicon photovoltaic

Polaris solar PV net news: on December 22, 2016, the United States Department of Commerce announced that, on Chinese imports of crystalline silicon photovoltaic cells (Crystalline Silicon Photovoltaic Cells,Whetheror Not Assembled Into Modules) of antidumping administrative review preliminary, Preliminary ruling: (1) 7 concerned during the administrative review no review during the survey period (companies listed in Schedule 1) and (2) 26 enterprises (companies listed in Schedule 2) separate tax applicable to 7.72%~30.42% and (3) 3 enterprises of Jiangsu photovoltaic technology limited (Jiangsu Sunlink PV TechnologyCo.,Ltd.), Ningbo Hisheen ElectricalCo ., Ltd. and Shenzhen Rui industrial company limited (Shenzhen Glory IndustriesCo.,Ltd.) for failing to submit separate rate application or prove that it applies to 238.95% of Chinese general tax rates. Products involved United States harmonized tariff number 8501.61.0000, 8507.20.80, 8541.40.6020, and 8541.40.6030 and 8501.31 8000. The administrative review investigation period December 1, 2014 to ~2015 November 31.

November 16, 2011, United States Department of Commerce issued a bulletin on crystalline silicon PV cells imported from China started anti-dumping investigation. On May 25, 2012, United States Department of Commerce issued a bulletin on Chinese imports of the products in connection with anti-dumping anti-dumping early layoffs by delay final affirmative initial award and emergency time, on June 25, after amendments to the preliminary results. On October 17, 2012, the United States Department of Commerce announced anti-dumping against Chinese imports of products made in connection with final and emergencies must be final. On December 7, 2012, the United States Commerce Department issued a bulletin to modify final results and enact anti-dumping tax. On February 9, 2016, the United States Department of Commerce issued a bulletin on Chinese imports of crystal silicon PV cell starts the third administrative review of anti-dumping investigation.

Appendix 1: no review of transactions list


United States anti-dumping against China made of crystalline silicon photovoltaic cells early administrative review Conference (2014-2015)

Appendix 2:26 separate tax in connection with the company list


United States anti-dumping against China made of crystalline silicon photovoltaic cells early administrative review Conference (2014-2015)

United States anti-dumping against China made of crystalline silicon photovoltaic cells early administrative review Conference (2014-2015)

United States anti-dumping against China made of crystalline silicon photovoltaic cells early administrative review Conference (2014-2015)

Original title: United States to China beginning of crystalline silicon PV cells made of antidumping administrative review Conference (2014-2015)

784a9daa.jpeg

Paper thin 3D printing solar panels

Polaris solar PV net news: solar panels are gradually changing our approach to energy access, especially when considering self-powered next-generation housing, in order to achieve this dream, researchers worldwide are actively trying to use additive manufacturing technology to optimize the production of solar panels. This includes a team of Australian research team of 50 scientists.

The team of Australian scientists in the past few years have been developing an organic 3D printing paper-thin solar panels, it can even provide energy for an entire skyscraper. Developers want to be able to in the near future, with low energy as a starting point towards the commercialization of this new type of device manufacture. This technology can effectively reduce dependency on traditional energy sources in developed countries, meanwhile, can also provide developing countries with an economical and viable source of electricity.

Unlike traditional solar panels is, these solar cells can include paper glasses and roofs are printed directly on the actual housing location. In addition to use in large buildings, developers have tried to use these units for small objects, such as bodacious iPad. If this vision can be achieved, then the surface of the iPad, laptop backpacks and cell phone case will not only serve as a package, they also function as energy collectors, provide power for these removable devices.

Currently researchers use 3D printer has been successfully improved solar ink each organic solar cell unit is reduced to the size of a coin size, this solar cell paper is very cheap, and ways of working with traditional silicon based solar panels are different. The University of Melbourne and Monash University, consisting of cooperation agencies have even begun thinking about how to apply this technology to the world with almost no electricity in remote areas.

Next, the researchers hope to get support from the Government, and to extend this technology to public places.

Original title: “paper thin” 3D printed solar cells, have you seen it?
Foreign news

78435fc3.png

November Korea 63 7 polysilicon soaring exports to China accounted for more

Polaris solar PV net news: according to the latest customs statistics, in November 2016, China imports increased sharply to 13584 tons of polysilicon, rose 56.5%, an increase of 35.5%. 2016 as of November, the cumulative imports reached 125798 tons, an increase of 18.2%, the average monthly import volume in 11436 tons. November polysilicon customs import has the following three characteristics:

First, from the Korea imports reached record levels. November 2016 Korea imports reached 8366 tons, substantially increased 63.7% per cent, the share of total imports reached an unprecedented 61.6%. 1-November accumulated from Korea imports 62947 tons, 50% per cent of total imports, remained among the imports in the first place. November from Korea monthly imports close to total imports in October, Korea’s exports surge, is due November lower demand warmer than in October, along with increasing demand for imported raw materials, so Korea polysilicon plant in October due to weak demand before the backlog of inventory in November, flooding the domestic market. The other hand, Korea silica material factory in Korea poly influence midterm review, set up trading companies in China in advance, advance clearance, in time for the determination of production and inventory exports to the Chinese market.

Second, the United States imports increased. November 2016 from United States imports increased to 733 tonnes, representing a 154% per cent. From July 2015, the United States due to “double” rate and the “suspension of processing trade measures” strictly impact poly export to China blocked from the United States months percentage of imports plummeted, lowest to 0.1%, but increased again in November to 5.4%. In November from the United States by way of processing trade imports was 645 tons, 88.1% per cent of total imports for the month, today 1-November from United States imports 4219 tons, by way of processing trade imports accounted for 89.9%, by which it adopted “bonded warehouse” entered at 90.8% per cent.

Third, from Germany import prices low. November from Germany import prices fell to us $14.03/kg, or 18.5% per cent, a record low. November from Germany import polysilicon 2711, 20% per cent of total imports, increased 16.5% per cent. From Germany import prices fall sharply in November, associated with the demand for imports in October has yet to be restored, Germany imported polysilicon are generally lag of a month or so, the demand for more domestic recovery slower, so Germany import prices, but because of Korea and the United States has a different degree of rise in import prices in November, prices also rose slightly, the chain or 3.8%.


November Korea 63.7% polysilicon soaring exports to China accounted for more than 61.6% hits new high

Figure 12,015 November-November 2016 polysilicon imports and import price chart data source: customs

According to country-specific import data show that imports in November totaled 13584 tons, from Korea and the United States, and Germany, and Taiwan four imported 12525 tons, accounting for 92.2% of the total imports. November from Korea imports 8366, 61.6% per cent of total imports from United States imports of 733 tons, 5.4% per cent of total imports from Germany is 2711 tonnes were imported, accounting for 20% of the total imports from Taiwan was 716 tonnes were imported, total imports of 5.3%; imports of other parts of 1059 tons, accounting for 7.8% of the total.


November Korea 63.7% polysilicon soaring exports to China accounted for more than 61.6% hits new high

Country-specific statistics are as follows:

Korea:

November 2016 from the Korea import polysilicon 8366 tons, substantially increased 63.7% per cent imports price rose to 13.64 dollars/kg, or 12.4% per cent.

2016 1 by November from the Korea import polysilicon 62947 tons, up drastic increase of 37.1% total import price $14.65 per kg, down 11.4%


November Korea 63.7% polysilicon soaring exports to China accounted for more than 61.6% hits new high

United States:

November 2016 from United States imports of 733 tons of polysilicon, the chain increased substantially by 154%; unit price of imports in November rose sharply to $21.80 per kg, per cent decline to 117.6%.

2016 1 by November from the United States imported polysilicon is 4219 tons, down 68.1% total import price $33.29 per kg, up 80%


November Korea 63.7% polysilicon soaring exports to China accounted for more than 61.6% hits new high

Germany:

November 2016 from Germany import polysilicon 2711 tons per cent increase 16.5% November innovation of import price as low as US $14.03/kg, or 18.5% per cent.

2016 1 by November from Germany import polysilicon 32081 tons, an increase of 9.7% total import price $15.87 per kg, down 22%


November Korea 63.7% polysilicon soaring exports to China accounted for more than 61.6% hits new high

According to customs statistics show that in November 2016, China poly silicon exports to 308 tons, increased 86.7% per cent in January-November, 6915 tonnes, down 1.5%.


November Korea 63.7% polysilicon soaring exports to China accounted for more than 61.6% hits new high

Original title: November Korea 63.7% polysilicon soaring exports to China accounted for more than 61.6% hits new high

784be688.jpeg

The policy of the original national development and Reform Commission on adjusting

Polaris solar PV net news: the change-price [2016]2729

Provinces, autonomous regions and municipalities directly under the national development and Reform Commission and the Bureau, the State grid Corporation of China in Inner Mongolia, China Southern power grid company, power company:

For the Council of the implementation of the strategic action plan for energy development (2014-2020) about wind power, photovoltaic electricity prices by 2020 goal of parity requirements to guide the new energy investment, promote the healthy and orderly development of photovoltaic and wind power industry, according to the renewable energy law, decided to adjust the new benchmark price of energy policy. Research and related matters are hereby notified as follows:

And reducing photovoltaic and wind turbine on land benchmark price

According to the new energy and industrial technology progress and cost reductions, reduced after January 1, 2017, the new photovoltaic onshore wind and approved after January 1, 2018, a new building benchmark price, the specific price see annex 1 and annex 2. Before 2018 if significant changes in the new onshore wind project construction cost, countries can be adjusted according to the actual situation the benchmark price. Released prior to this new benchmark year new onshore wind power pricing policy is no longer performed. Photovoltaic power generation, onshore wind power price new benchmark coal price on the ground (including desulfurization, denitrification, dust price) within part of the settlement by the local provincial power grid; higher parts be subsidized through the national renewable energy development fund.

Two new benchmark, specifically offshore wind electricity price

Offshore wind energy projects to non-tender, distinguish between offshore wind power wind turbine and intertidal two types determines price. Offshore wind power project benchmark price for 0.85 Yuan per kWh, wind power projects in the intertidal benchmark price of 0.75 Yuan per kilowatt hour. Offshore wind power price new benchmark coal price on the ground (including desulfurization, denitrification, dust price) within part of the settlement by the local provincial power grid; higher parts be subsidized through the national renewable energy development fund.

Third, encourage market-oriented way, such as through public bidding to identify new energy tariff

Established around the State encourages competition in the market, such as through public bidding photovoltaic power generation, onshore wind power, offshore wind power and other renewable energy project and price, but through market competition means shall not be higher than the price of State-mandated similar resource areas of photovoltaic power generation, wind power, offshore wind power on land benchmark price. Public bidding market competition determine prices, new benchmark coal price on the ground (including desulfurization, denitrification, dust price) within part of the settlement by the local provincial power grid; higher in part by the national renewable energy development fund to be subsidized.

Four, the other relevant requirements

The new energy power generation and grid enterprises must be true and complete record and keep the electricity generation project Internet trading, pricing and subsidies, information, receive relevant departments of supervision and inspection. Pricing departments at all levels should strengthen the new energy price execution and clearing regulatory fund subsidies for renewable energy development, and urged the relevant price policies in place.

The implementation with effect from January 1, 2017.

Annex: 1 new benchmark, the national PV price table

784799f4.jpeg

Tianjin Binhai New area on the implementation plans submitted to the 2017 solar

Polaris solar PV net news: businesses:

In order to prepare for the 2017 plan reporting on implementation of photovoltaic power generation, wind power generation, will be submitted to the 2017 solar power, wind power notice implementation plan is forwarded to you, please do the following as required:

, Positive and serious reporting:

List of businesses in the region to seriously study all the contents of the file, prepare application materials according to the requirements of eligible enterprises.

Second, on-time reporting applications

All original application materials please to report back by December 29, 2016 free trade zone management Committee of development and reform Bureau (airport economic zone West, 166th), electronic documents and submit the relevant materials (reporting instructions, schedules and related accessories seal hair color PDF scan), is not reported within the prescribed, submit materials incomplete, does not meet the reporting criteria shall not accept it.

Third, contact

Contact person: Jiang Min Tel: 84906091

Email: jiangmin@ADM.tjftz.gov.CN

Annex:

1, on the implementation plans submitted to the 2017 solar power, wind power notice


Tianjin Binhai New area on the implementation plans submitted to the 2017 solar power notice

2, 2017 of Binhai construction of photovoltaic power generation scheme report table


Tianjin Binhai New area on the implementation plans submitted to the 2017 solar power notice

3, photovoltaic power generation project description


Tianjin Binhai New area on the implementation plans submitted to the 2017 solar power notice

Original title: forwards on the implementation plans submitted to the 2017 solar power, wind power notice notice