Guangzhou City development and Reform Commission concerning the organization

Polaris solar PV net news: the district development and reform Bureau, Guangzhou power supply Bureau and relevant enterprises or individuals:

For speeding, distributed PV applications that encourage building owners contribute roofing resources, mobilize investment and construction of distributed PV initiative, Guangzhou City, Guangzhou City, according to the national development and Reform Commission on issuing notifications distributed photovoltaic power generation project management approach (Spike development of energy (2014), 33rd), spirit, 2016 the first solar photovoltaic power generation project construction Organization Declaration of special funds. The notice are as follows:

, The amount of subsidy and grant

(A) grants

Residents family and administrative organ buildings solar PV power project, grants object for project construction residents personal or units, can application electricity grants; other type (refers to except residents family and administrative organ yiwai of) buildings or abandoned land, and mountain shortage slope, and agricultural big shed, and beach, and garbage fill buried field, and ponds, and Lake, site solar PV power project, grants object for buildings ownership people and project units, which, units can application electricity grants, buildings ownership people can application capacity grants.

(B) the subsidy amount

1. the electricity subsidy. Enjoy the electricity subsidy project for the first time since the project grid-connected electricity generated by the date to June 30, 2016, based on standard of 0.15 Yuan/kWh subsidy. Have already enjoyed 0.1 Yuan/kWh electricity subsidy project dating difference electricity subsidy, since the electricity generated by grid-connected projects until July 31, 2015, calculated according to the standard of 0.05 Yuan per kWh subsidy amount electricity generated by August 1, 2015 – June 30, 2016, based on standard of 0.15 Yuan/kWh subsidy.

2. installed capacity of subventions. According to 0.2 Yuan/w standards, according to the total installed capacity of the project, determine the amount of subsidy, and individual project grants once a maximum grant amount to 2 million Yuan.

Second, declare conditions

(A) as of June 30, 2016, applied for electricity subsidy programs, parallel operation of 1 or more than 1 year of age, by the project owner, or individual applications; application capacity subsidy programs, third party acceptance and have been put into operation, by application by a building ownership;

(B) projects the construction unit shall be in the Guangzhou area in legally registered, has an independent legal personality of enterprises and public institutions.

(C) national Golden Sun or enjoy building integrated photovoltaics financial assistance projects shall not be declared.

Third, the reporting process

Items that meet reporting criteria, applied for by the applicant or individual allocation of funds of funds, fill in the application form for funding, through the project area after preliminary review opinions issued by the development and reform Bureau of the trial and submitted my Board.

Four, to declare material requirements

Funding application for units or individuals to fill in the application form for funding, and must provide the following documents:

(A) the project relies on a building or site title files (to prove legal proof of ownership or use of a building);

(B) funding applicant copies of business license and organization code certificate (individual home owner personal identity card copy);

(C) projects relying on the building or the site is used by contract or agreement (using its own building or site is not provided);

(D) the project documents;

(E) the incorporation documents of the project. For non-household items, letter of agreed projects grid from electricity sector; for household projects, issued by the power sector of photovoltaic grid-connected power generation project acceptance form;

(Vi) acceptance of the project file. For non-household items, providing a national laboratory accreditation certificate issued by the Inspection Agency inspection report; for household projects, issued by the Department proof of acceptance;

(VII) PV modules and inverters of third party test reports;

(H) project resident individuals or units will provide the project issued by the power sector reporting requirements time electricity generated by nodes within the document.

Five other requirements

(A) requested the regional development and reform Bureau organization to declare the project as soon as possible, a careful review of application materials, submitted preliminary review opinions, to summarize the reporting project, fill in 2016 the first solar photovoltaic power generation project construction fund to declare the project summary, on July 25, 2016 declarations submitted before I Board (a-3), while the relevant materials to the electronic version is sent to [email protected], if inadmissible.

(B) please notify meets the conditions for declaration of Guangzhou power supply Bureau on behalf of residents from districts in which the project development and reform Council comments Summary submitted in the first instance I.

(C) requested the regional development and reform Bureau touched check distributed PV power generation projects in this area for record and construction about, fill in the table showing construction of distributed solar power projects for the record and, on July 25 form before submitting my authority, while the electronic version is sent to [email protected]

Original title: Guangzhou City development and Reform Commission on organization declared 2016 for the first batch of special funds for solar photovoltaic power generation project construction notice