On 2016 in Shanxi province ordinary PV competitive allocation scale indicator

Polaris solar PV net news: the municipal development and Reform Commission:

For further perfect PV power scale management, full play market in resources configuration in the of based sex role, specification PV power development order, speed up advance PV industry upgrade, according to national development reform Board, and Energy Council on perfect PV power scale management and implemented competition way Configuration project of guide views (sent modified energy (2016) 1163th,) requirements, Shanxi province 2016 General PV power station project take competition assessment of way configuration PV scale index. Related matters are hereby notified as follows:

First, scope of assessment

2016 issued by the National Energy Board on 2016 issued the notice on PV implementation programmes (new energy (2016), 166th) issued a general indicator PV power station 700,000-kilowatt in our province. Given that the province has started construction and photovoltaic projects larger reserves, 2016 competitive allocation size indicators focusing on the following range of photovoltaic power generation project: ⑴ in 2014, 2015 documented carry-over projects; b 2015 variant, optimization of medium-term projects; c reported by the municipal development and Reform Commission recommended 2016 reserve project.

Second, basic principles

1, open, fair and just. In accordance with the requirements of national laws and regulations for all investors and projects, open competition and fair comparison.

2, the city is recommended. According to the policy of national PV industry, the municipal development and Reform Commission recommended preferred financial and technical strength highlights, running with higher levels of performance, demonstration, and contribute more to local economies in transition and integrity performance, happened in Shanxi is not larger or more enterprises to participate in the competition of security incidents.

3, quality and efficiency. Focus on supporting the PV industry to upgrade and make contribution to the progress of technology, effectively reducing the photovoltaic capital cost and price of electricity projects.

4, mature first. Grid-connected or already have a condition of grid-connected PV power generation projects is a plus, focusing on reporting project, access, implementation of infrastructure conditions. Prior to June 30, 2016-grid project (grid provides the basis for) high on annual implementation programme for photovoltaic power generation in our province.

5, the province overall. According to the provincial government’s arrangement, considering the city’s solar energy resource and distribution of PV industry, make overall arrangements.

Three, the Organization of work

Optimize working organization jointly by provincial, municipal development and Reform Commission. In the municipal development and Reform Commission, on the basis of an initial, provincial development and Reform Commission to entrust water planning Institute (national PV technology to administer units) to recommend assessment of the project.

1, the eligibility review

This phase of the work, by the municipal development and Reform Commission is responsible for. All municipal development and Reform Commission Organization projects for eligibility to compete in the city audit. Eligibility review should include the following main aspects:

(1) the investor as a legally independent legal entities.

(2) all credit behavior of the investor.

(3) selling “flagging”, project of illegal behavior, such as enterprises, prohibited from participating in project selection.

(4) in previous projects, development, operations do not appear larger or more accidents in the process.

2, data submitted to

In qualified sex review of based Shang, the city NDRC unified organization the city participation assessment of PV power project, to national can renewable energy information management Center website (http://djfj.renewable.org.CN/) online submitted this city PV power project construction run progress, situation (main including project early work, and record, and grid run,), attached this city 2016 PV power project recommended information table (see annex 1), and the recommended project units according to Photovoltaic power generation project assessment report material preparation requirements for the preparation of declarations (see annex 2), and in an official document (including electronic) submitted to the provincial development and Reform Commission.

3, selecting the recommended

The work at this stage, the water planning Institute is responsible for. Water Planning Institute organized experts to recommend information score of photovoltaic power generation project in a table. Assessment work will be in accordance with the standard (see annex 3) to score the application materials, out of 100 points.

4, determine the annual implementation plan

According to the assessment results, provincial development and Reform Commission, the provincial supervision Office, the provincial power company and manpower determine annual implementation programme for photovoltaic power generation in our province.

Four, work requirements

(L) the municipal development and Reform Commission before July 28, unified organization involved in selecting PV power generation projects in the municipalities, to complete the documents submitted. Fails to report deemed abandoned Declaration eligibility, provincial development and Reform Commission, water planning Institute does not accept direct submissions.

(2) the provincial development and Reform Commission, the provincial supervision Office, the provincial power company set up a Steering Committee, to supervise the assessment work throughout.

(3) during the assessment for disciplinary violations, once verified, in accordance with the relevant provisions of stern.

(4) annual implementation programme for photovoltaic power generation release date, is not started within six months, a year is not completed within the grid project, depending on the size of its waiver of 2016 targets. Projects that are not included in the scale of control units, size of which they were elected into the annual implementation plan.

(5) items for inclusion in annual implementation programme for photovoltaic power generation, its investors and equity ratio and other major content shall not be changed without authorization, prior to completion of the project shall not be transferable. As a result of these irregularities, cancel qualification for national renewable energy subsidies.

Annex, 1:xx PV project referral information sheet

Annex 2: PV project assessment report material preparation requirements

Annex 3: marking table

Contact person and phone:

Shanxi provincial development and Reform Commission Chai Linliang 0351-3119815

Hydropower water conservancy Planning Institute Qin Xiao 010-51973148


On 2016 in Shanxi province ordinary PV competitive allocation scale indicator work notification

On 2016 in Shanxi province ordinary PV competitive allocation scale indicator work notification

Annex 2

Photovoltaic power generation project assessment report material preparation requirements

, Applicant profile

Briefly project declared units of main business, and business years, and assets liabilities, and shareholders constitute, and main engaged in or investment project, and existing business project (business) scale, and near three years financial status (assets liabilities rate, net profit, average net worth, average total assets, profit total, business income net amount; liquidity, flow liabilities; business activities cash flow net amount), and funding letter grade, and whether has engaged in power engineering (can renewable energy power,) performance and the main performance situation, content.

Project investor is required to provide the following materials, proven investment funding for demonstration projects (table form and copies of audit reports should be stamped on the cover):

1, business licenses

2, loan commitment letter

3, proof of credit ratings

4, 2012-2014 or invest the balance sheets of the units since its establishment;

5, 2012-2014 or investment cash flow statement of the unit since its establishment;

6, 2012-2014 since the establishment of the profit and loss account or investment units;

7, 2014 annual financial audit report issued by an accounting firm.

Second, the preliminary work of the project profile

Brief declaration has carried out preparatory work and progress of the project, including grid access, land agreements, made comments supporting files, such as site selection.

Offers have been made and issued by government departments at or above the county level shall support, sealed copy of this material in the form, including but not limited to, the following:

1, and Government departments at or above the county level the principle of consent;

2, city-level and above of the electricity sector agreed in principle to comment on grid access;

Principle for 3 other files including site selection, environmental protection, forestry, military, civil aviation and cultural heritage.

4, there has been substantive progress in the construction of project, shall provide proof of the degree of implementation of the investment, including but not limited to, the main settlement voucher and adjustment of equipment inspection record, field supervision, and information related to multimedia.

Third, the price level

Description project measuring of Internet electric price (containing tax) and the border conditions, lists project power capacity and the attenuation rate, and total estimates table are counted column of static investment cost, and tax border conditions (at least including but not limited to run period maintenance take fee rates, and personnel number and the wage, run period cost, sources constitute and the loan cost and cycle, and the tax take fee rates, and depreciation years), and calculation Internet electric price by with of capital returns rate level, main parameter, detailed measuring process and the form put in fifth chapter fourth section.

Project units made after filing, committed to the implementation of price (including tax).

Four, the level of performance

According to the following table to fill in grid-connected unit has concentrated photovoltaic power plant performance data. (With proof)


On 2016 in Shanxi province ordinary PV competitive allocation scale indicator work notification

Five, projects, technologies, economic programmes

(A) project site conditions

Declared project site overview, should including site accounted for to area and the site inflection point coordinates, grid access system (description preliminary access points and the distance,), traffic transport conditions, hydrological and the meteorological conditions (whether set meteorological data Observatory), water, earthquake, and geological and the rock soil engineering, aspects, and on project site whether exists Subversion sex factors for description, site conditions of research depth should reached GD002-2011 PV power engineering pre feasibility research report prepared approach of requirements.

(B) the project implementation plan

Reference to GD002-2011 the PV engineering pre-feasibility study method in section 3.9 of the content, based on overall project implementation plans should at least include the preparation, feasibility study, design, construction, commissioning, cast node schedule.

(C) the investment estimation

Depth up to GD002-2011 of the photovoltaic power generation project feasibility study report requested in section 3.11 of the approach.

(D) the financial results of preliminary analysis

Depth up to GD002-2011 of the photovoltaic power generation project feasibility study report requested in section 3.12 of the approach.

(E) the device advancement

Essential equipment for the project proposed technical parameters, system efficiency reflected projects such as advance indicators.

Six other

Illustrate the contribution of enterprises to the transformation of the local economy, and provide project related documentation issued by the local-level Government.

Clear project in Shanxi province, for the record, or has been included in the options, or with coal (mine) subsidence area of integrated ecosystem management, agriculture, fisheries, aquaculture and other combination of PV power, or in the new energy model city or prefecture-level city levels have a clear photovoltaic project subsidy policies, and provides an explanation or proof.

Seven, supplementary materials

Project unit according to the enterprise and the actual conditions and characteristics of the project, adding other materials deemed necessary by their own. Project has been built, and focuses on the current situation of construction of the project, and to provide valid documents that prove that investment levels.

Eight, declared material binding requirements

In accordance with the preparation of all of the requirements referred to in the annex, schedule a single bound are sorted by the required chapters in turn


On 2016 in Shanxi province ordinary PV competitive allocation scale indicator work notification

On 2016 in Shanxi province ordinary PV competitive allocation scale indicator work notification

Original title: 2016 General PV power station project in the province of Shanxi of competitive configuration size notice indicators

Posted in Solar Charger.