Shanxi yangquan leader photovoltaic demonstration base 2016 project

Arctic star solar PV network news: according to national development reform Board National Energy Council on perfect PV power scale management and implemented competition way Configuration project of guide views (sent modified energy [2016]1163,), and national energy Council on issued 2016 years PV power construction implementation programme of notification (country can fully new can [2016]166,), and on PV power lead technology base work coordination will of Conference summary of (country can fully new can [2016]409,) requirements, Yangquan city development and Reform Commission national advanced technology in mining subsidence area in yangquan city of Shanxi photovoltaic power generation demonstration base 2016 projects commissioned and hydropower planning and Design Institute of water resources for public investment. The investment follows the principle of openness, fairness, impartiality and good faith, welcomes investment from qualified investors.

This investment announcements and related information in the yangquan City Government website and hydropower planning and design of water conservancy Institute Web site.

A basic condition

1, the working personnel: yangquan city development and Reform Commission

2, investment optimization companies: hydropower planning and design of water conservancy Institute

3, business number: PVP-SXYQ/SDG-2016-01

4, project location: in yangquan city of Shanxi province.

5, the project description: to promote transformation and upgrading of national PV industry, leading the decline in electricity prices, adjust the industrial structure is dominated by coal-fired power, building State of the art technology in mining subsidence area in yangquan city photovoltaic power generation demonstration base 2016 planned installed capacity of 1 million kWp of photovoltaic base. According to the overall layout of photovoltaic base planning, base divided into 13 single projects, including: photovoltaic power generation demonstration project 12, platform 1. Construction in the period up to 2017, development and operation for a period of 25 (25) years (not including the building period).

6, investment: building State of the art technology in mining subsidence area in yangquan city 2016 PV photovoltaic power generation demonstration base, 12 PV power plant project 7 project monomer monomer capacity capacity of 100,000 kWp,5 items for 50,000 kWp, the platform project is not within the scope of the investment (otherwise preferred merchants).

Two investor eligibility requirements

7, an investor must be a single enterprise, with independent legal personality, does not accept the Consortium.

8, a group can only be in the name of the group, or specify which wholly-owned subsidiaries or holding companies in the Declaration.

9, investors reached more than 500 million Yuan RMB of net assets and total assets reached more than 1 billion yuan RMB, registered capital of more than 500 million Yuan.

10, performance ability, to meet one of the following conditions:

(1) applications for construction investment has been grid-connected photovoltaic systems that run (including on-grid off-grid) of capacity (in equity volume) is not lower than 200MWp (performance at home and abroad to provide complete and valid proof).

(2) the Shanxi provincial energy company project in yangquan city investment of 2 billion yuan, or more than the energy enterprises in the province, with a total capacity of grid-connected PV systems that run (by equity volume) is not lower than 50MW (proof of performance at home and abroad must provide a complete and effective), the enterprise no less than 2.5 billion yuan in total assets.

11, investment firm commitments in yangquan to set up wholly-owned company as the subject of project development and construction of the project.

12, investment commitments follow the same provisions of photovoltaic base construction of public facilities, the construction of public facilities, according to the base uniform technical requirements, construction, management, operation, evaluation and cost-sharing.

13, investors in all honesty, pre-January 1, 2013 has no bargaining power to sell photovoltaic projects.

14, all credit requests, except for special instructions, according to June 30, 2016.

Third, investors submitted information of the time and place

15, investors buy investment information date: August 3, 2016 until August 4, 2016, to 9:00 daily 11:00 (Beijing time).

16, investor information documents submission date: August 24, 2016 9:00~12:00 (Beijing time).

17, investors buy investment information location: North ring within Andingmen, Dongcheng District, Beijing Feng exhibition, Beijing four-floor conference room.

18, data submission: August 21, 2016 on 17:00 inform all potential investors to buy investment information (through the purchase of investment files registered email address and mobile phone number), and subsequent announcements by hydropower planning and Design Institute of water resources sites.

19, investment contact: Qin Xiao, and fuzhengning.

20, the working personnel Tel: 010-51973148/15210127278 (working days from Monday to Friday, 9:00~11:00).

21, business contact email: [email protected]

Four others: potential investors please contact business contact for more information.

Original title: national advanced technology in mining subsidence area in yangquan city of Shanxi photovoltaic power generation demonstration base 2016 project announcements

Posted in Solar Charger.